Plan the work

Use the project’s Work section for tasks and timeline phases. Give each task a concrete action and each phase a meaningful name. Check the project selector when adding a phase—even when you opened the form inside a project.

  1. Enter the phase name and project.
  2. Choose valid start and end dates; the end must be after the start.
  3. Add status and notes, then save.
  4. Reopen the timeline to verify the phase appears where expected.

Keep dates useful

Change statuses as work progresses and review overdue items regularly. A dashboard deadline card summarizes relevant records; it does not replace reviewing the full timeline. Project dates, phase dates and calendar events can represent different things, so keep each accurate.

Google Calendar

Use the available Google Calendar connection flow to authorize the calendar account you intend to use. Review the permissions shown by Google. Check the connection and sync results after adding an event; do not assume that all historical events were imported. If an event is missing, check the selected calendar and reconnect only through the normal authorization flow.

Still need a hand?

Tell us what you were trying to do and where you got stuck.